+
Year in Infrastructure 2026: Subsurface Modeling and Analysis winner announced
Hinkley Point C completes 620 m fish return tunnel beneath Bristol Channel
GeoStudio 2026.1 New Release: Advancing Engineering Productivity Through Usability and Performance
Three dead and infrastructure damaged as eastern Spain recovers from severe flooding
Inside the ground beneath Bologna’s Two Towers: 3D model pinpoints 570 kPa stress peak under leaning Garisenda
Severe flooding puts New Mexico dam and downstream communities at risk
Faster Foundation Installation for Modern Railroad Infrastructure
Sun and moon may help trigger slow earthquakes through resonance
1,600-ton TBM begins 4.4 km Melito Tunnel beneath the Southern Apennines
Damage at Khao Chuk Dam prompts urgent evacuation in Rayong as Prasae Reservoir exceeds maximum level